The game Barrage: Colorado Connection
Barrage: The Colorado Connection is an add-on for 2- and 4-player games with the base game and the base game and the Leeghwater Project.
What will be the future of the Black Canyon?
The expansion includes a special map depicting the canyon-crossed Colorado area. Along with it, new elements enter the game: Bridge Construction Sites and Production Settlement areas, as well as a set of new Contracts, Orders and Investment tiles.
Bridges and canyons
The rivers shown on the Map flow along deep canyons, creating a clear physical separation between the designated regions: the presence of Bridges built on the crests of the Dams will allow an easier connection between the Production Settlements in each region; on the other hand, however, a Dam with a Bridge on it cannot be raised until the end of the game. So choose carefully when to build Bridges!
Production Settlements
Production Settlements are new action fields (4 in the Mountains, 3 in the Hills, 3 in the Plains) that can be activated by placing the required number of Engineers. Activating a Production Settlement incurs a cost in Credits, depending on the presence or absence of Bridges along the route from the Construction Site (located on the left in the Mountains and Plains areas and on the right in the Hills area) to the Production Settlement you intend to activate
The expansion includes a special map depicting the canyon-ridden Colorado area. Along with it, new elements enter the game: Bridge Construction Sites and Production Settlement areas, as well as a set of new Contracts, Orders and Investment tiles.
Please note that this is not a stand-alone game!
The basic version of the game: Barrage (Polish Edition) is required to play.